# Concrete calculator > How much concrete do I need? Cubic metres or yards of concrete and bags of pre-mix for a slab, a footing or post holes. How much concrete a slab, strip footing or set of post holes needs, in cubic metres or yards, and how many bags of pre-mix, with extra for spillage. - Page: https://how.box/concrete/ - Runs entirely in the browser. - License: HowToolbox's own text and data (titles, explanations, FAQs, tool descriptions and schemas, this file) are CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/); AI training and answers are welcome. Attribute "HowToolbox (how.box)" with a link to the page used. Third-party data keeps its own terms; the name and logo are not licensed. Publisher: HowToolbox, contact@how.box. Terms: https://how.box/about/terms/ ## Inputs Answer link: https://how.box/concrete/?k={k}&l={l}&w={w}&dm={dm}&d={d}&n={n}&u={u}&du={du}&x={x}&y={y}&yu={yu} - `k` (slab, footing or post): What is poured: slab, footing or post. Example: `slab`. - `l` (number 0.01 to 1000): Slab or footing length in metres. Example: `3`. - `w` (number 0.01 to 1000): Slab or footing width in metres. Example: `2`. - `dm` (number 0.01 to 1000): Post hole diameter in metres. Example: `0.3`. - `d` (number 0.005 to 20): Thickness or depth in metres. Example: `0.1`. - `n` (whole number 1 to 1000): How many, 1–1000. Example: `1`. - `u` (m, cm, ft or in): Length unit shown: m, cm, ft or in. Example: `m`. - `du` (cm, mm, m, in or ft): Depth unit shown: cm, mm, m, in or ft. Example: `cm`. - `x` (number 0 to 50): Extra allowance, percent. Example: `10`. - `y` (number 1 to 1000): Concrete per bag in litres. Example: `12`. - `yu` (l or ft3): Bag yield unit shown: l or ft3. Example: `l`. Example answer: https://how.box/concrete/?k=slab&l=3&w=2&dm=0.3&d=0.1&n=1&u=m&du=cm&x=10&y=12&yu=l A complete link carries the primary answer in the page HTML; a missing or invalid value shows the default page. ## Agent tools - `concrete_estimate`: Concrete for a slab or strip footing (length × width × depth) or round post holes (π × (diameter/2)² × depth), times count, plus waste %, and whole bags of pre-mix. - MCP, one POST to https://how.box/mcp: `{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{"name":"concrete_estimate","arguments":{"form":"slab","length":3,"width":2,"diameter":0.3,"depth":0.1,"count":1,"unit":"m","depth_unit":"cm","waste":10,"bag_yield":12,"bag_unit":"l"}}}` - GET: https://how.box/mcp/run/concrete_estimate?form=slab&length=3&width=2&diameter=0.3&depth=0.1&count=1&unit=m&depth_unit=cm&waste=10&bag_yield=12&bag_unit=l ## How it works Concrete is ordered by volume. A slab or a strip footing is a box, length × width × thickness; a round post hole is a cylinder, π × r² × depth, where r is half the diameter. Multiply by how many you pour, then add a little extra, because forms bulge, the ground is never perfectly flat and some is always spilled. Example: a 3 m × 2 m slab 10 cm thick is 3 × 2 × 0.1 = 0.6 m³. With 10 % extra, order 0.66 m³, or 660 litres. If a 25 kg bag of pre-mix makes about 12 litres, that is 660 / 12 = 55 bags. A post hole 30 cm across and 1 m deep holds π × 0.15² × 1 ≈ 0.071 m³, about six bags. The yield of a bag depends on the mix, so use the figure printed on the bag. For more than a cubic metre or so, ready-mixed concrete from a truck is usually easier and cheaper than bags. The volume counts the hole or form as you measured it, not gravel, reinforcement or a post set into the hole; the post takes some room, so a little concrete is usually left over. ## FAQ **How thick should a concrete slab be?** It depends on the load and the ground: garden paths and shed bases are often 7.5–10 cm (3–4 in), driveways more. Follow local building guidance for anything structural. **How many bags are in a cubic metre?** Divide 1 000 litres by the yield of one bag: with 12-litre bags, about 84 bags. In US units, a cubic yard is 27 ft³, so about 45 bags of 0.6 ft³. **Should I subtract the post from the hole?** You can, but most people don't: the post's share is small and the extra covers waste. **How much extra concrete should I order?** About 5–10 % is usual. Running out in the middle of a pour is far worse than a little left over. **What does bag yield mean?** It is the volume of mixed concrete one bag produces, not the bag’s weight. Use the yield printed on your bag. More: [HowToolbox index](https://how.box/llms.txt) · [Agent Skill](https://how.box/skill.md) · [agent terms](https://how.box/about/agents/)