How much concrete do I need?
Cubic metres or yards of concrete and bags of pre-mix for a slab, a footing or post holes.
What you enter stays on your device while you use this tool. Opening a shared link sends the settings in its address to HowToolbox to prepare the page.
Count, extra and bags
5–10 % is common; more on uneven ground or for a first pour.
The yield printed on the bag: a 25 kg bag of pre-mix makes about 12 litres, an 80 lb bag about 0.6 ft³.
Concrete to order
0.66 m³
55 bags of 12 L · 0.6 m³ in place plus 10%
Volume
- To order, in litres
- 660 L
Cubic metres or yards of concrete and bags of pre-mix for a slab, a footing or post holes.
How to use
- Choose a slab, a strip footing or post holes.
- Enter the length and width (or the hole diameter) and the thickness or depth.
- Below, set how many, the extra for spillage and the yield on your bag; read the concrete to order and the bags to buy.
Concrete for 10 cm slabs: 10% extra, 12 L per bag
How it works
Concrete is ordered by volume. A slab or a strip footing is a box, length × width × thickness; a round post hole is a cylinder, π × r² × depth, where r is half the diameter. Multiply by how many you pour, then add a little extra, because forms bulge, the ground is never perfectly flat and some is always spilled.
Example: a 3 m × 2 m slab 10 cm thick is 3 × 2 × 0.1 = 0.6 m³. With 10 % extra, order 0.66 m³, or 660 litres. If a 25 kg bag of pre-mix makes about 12 litres, that is 660 / 12 = 55 bags. A post hole 30 cm across and 1 m deep holds π × 0.15² × 1 ≈ 0.071 m³, about six bags.
The yield of a bag depends on the mix, so use the figure printed on the bag. For more than a cubic metre or so, ready-mixed concrete from a truck is usually easier and cheaper than bags. The volume counts the hole or form as you measured it, not gravel, reinforcement or a post set into the hole; the post takes some room, so a little concrete is usually left over.
Method
No outside data is used: the result is worked out directly from the formula V = l × w × t, explained under How it works.
Frequently asked questions
How thick should a concrete slab be?
It depends on the load and the ground: garden paths and shed bases are often 7.5–10 cm (3–4 in), driveways more. Follow local building guidance for anything structural.
How many bags are in a cubic metre?
Divide 1 000 litres by the yield of one bag: with 12-litre bags, about 84 bags. In US units, a cubic yard is 27 ft³, so about 45 bags of 0.6 ft³.
Should I subtract the post from the hole?
You can, but most people don't: the post's share is small and the extra covers waste.
How much extra concrete should I order?
About 5–10 % is usual. Running out in the middle of a pour is far worse than a little left over.
What does bag yield mean?
It is the volume of mixed concrete one bag produces, not the bag’s weight. Use the yield printed on your bag.